|
Time is money, and nowhere is that more true than in cyberspace. Glumac understands the urgency of getting a system designed and on-line in the shortest time possible. Considerable money can be lost each day a system is not delivered correctly and on schedule. Construction costs for renovations and new critical facilities are among the highest of all building types. The Glumac approach includes a reliability and cost analysis specific to each client's needs. We provide options for reliability upgrades along with their associated cost, and recommendations for which measures are most suitable to meet the client's needs. Many data center failures are due to human error. Designing facilities that can be easily understood and operated by the critical facilities staff, can be as important as additional levels of redundant equipment. That is why we have dedicated a team of engineering professionals to pilot our 24/7 Mission Critical Design Team. |
|
Seattle
T. 206.262.1010
1325 Fourth Ave., Suite 1515
Seattle, WA 98101-2509
Portland
T. 503.227.5280
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
San Francisco
T. 415.398.7667
150 California St., 3rd Floor
San Francisco, CA 94111-4525
Sacramento
T. 916.934.5103
910 Glenn Dr.
Folsom, CA 95630-2527
Irvine
T. 949.833.8190
18200 Von Karman Ave., Suite 100
Irvine, CA 92612
Los Angeles
T. 213.239.8866
617 W. 7th St., 5th Floor
Los Angeles, CA 90017-3830
Shanghai
Jing'An China Tower, Ste 303
1701 Beijing West Rd.
Shanghai 200040 China
T: (86) 21-62881010
F: (86) 21-62881050
1-888-GLUMAC-1 (1-888-458-6221) © 2010 Glumac. All rights reserved. Site design by WOW Branding.